Project #1402 · Full replacement

Project 1402: Full TPO roof replacement with tapered insulation in Muleshoe

In short

Project 1402 replaced an aged gravel-surfaced built-up roof on a commercial facility in Muleshoe. After years of Lubbock-branch service calls, the owner moved from reactive repairs to a planned CapEx replacement: base insulation, a full tapered system to create positive slope, new gutters, and a fully adhered TPO membrane.

flat roof commercial building after roofing installation
Project
#1402
City
Muleshoe
Existing
Gravel BUR
System
Fully adhered TPO
Branch
Lubbock

Project gallery

Before and during the work

Project 1402 TPO replacement, Muleshoe project photo 1
Project 1402 TPO replacement, Muleshoe project photo 2

Scope

What the project involved

  • +Full replacement of gravel-surfaced built-up roof
  • +Base layer of insulation over the flat structural deck
  • +Full tapered insulation system for positive slope
  • +New gutter system sized for redirected drainage
  • +Fully adhered TPO membrane

Solution

How we approached it

The original gravel BUR had been maintained through repeated service calls until it reached the end of its lifecycle. A CapEx plan let the owner schedule replacement instead of waiting for an emergency.

The flat structural deck needed slope. We installed base insulation, then a full tapered system directing water to a new gutter layout, and closed with a fully adhered TPO membrane chosen for UV resistance and energy performance in West Texas.

Related decisions

Explore the system and location

Next step

Get a condition report before you commit to a system.

Photographs, documented findings, and a written recommendation. Certificate of insurance available before contract.

Call nowRequest inspection